How we work
The mono pile is the preferred foundation method for wind farms with special requirements on pile handling and adjustment.
High energy and large pile size installations are supported using MENCK pile driving equipment.
Hammers & Spread
A hammer with energy from 100kJ up to 3500 kJ is available in our rental fleet. All additional equipment like a Power pack, air compressor, hose winch, hoses and umbilical are available to provide the whole spread for your operation.
Also, pile diameters above 6 m / 152" can be driven.
Availability
Our equipment is located on several yards worldwide. The main yards are in Germany and Singapore where we also can do the assembling of the equipment.
The equipment is containerized on a high level what makes it easy to transport globally if necessary.
In Support Globally
MENCK is a global business with facilities in Europe, US and Asia-Pacific with multiple crews offshore at any given time.
With over 140 years of experience driving piles, MENCK confidently supports any subsea pile driving project anywhere, for any business.
In support of a project, MENCK provides a complete after sales service including logistics, training, technicians and parts supply.
Menck Projects
To see a series of MENCK pile driving projects in your industry, please visit:
Complete Subsea Services
MENCK provides additional subsea services in support. Together with Acteon Group companies, we offer:
- Drilling
- Vibrating
- Lifting, Upending and Handling
- Grouting
- Pre-installation conductors
- Grouting
- Survey
- More...
Wind Power
For all levels of the wind power supply chain, click here for technical data and the latest developments from the wind power team at MENCK.
Civil Engineering
Oil & Gas
For specific information, news and technical data from the MENCK oil and gas team, click here.
Selecting Hammers
This table provides key information about each MENCK hammer suitable for shallow water installations.
For more detailed information, please visit individual hammer pages or contact the MENCK team for advice or technical support.
Even on special requirements we are able to find the right solution for your project. Look at MENCK's pile size section to find equipment that fits with your project requirements.
MHU above & shallow water series
Unit | 270T | 400T | 500T | 750T | |
Minimum energy | kj | 30 | 40 | 50 | 75 |
Maximum energy - surface | kj | 300 | 440 | 550 | 820 |
Maximum energy - 1000 m depth | kj | 270 | 400 | 500 | 750 |
Oil flow | l/min | 600 | 1000 | 1150 | 1600 |
Blow rate at max energy | bl/min | 40 | 38 | 38 | 38 |
Ram weight | t | 16.2 | 24.3 | 30.2 | 45.4 |
Total hammer weight | t | 30.8 | 49.1 | 59.8 | 79.6 |
Standard Configuration | |||||
Pile sleeve | 1.6m | 60" | 2.2m | 84" | |
Total weight dry w/MHP DWS | t | 66 | 85.8 | 113.7 | 147.8 |
Total weight under water | t | 52.5 | 75.5 | 90 | 118.3 |
Hammer length w/pile sleeve | m | 12.7 | 14.5 | 16 | 17.6 |