Ivar Aasen
Ivar Aasen
Project Overview
Year:
2015
Location/Region:
Europe / Norway
Ivar Aasen will be developed and operated from Trondheim. Det norske aims to make use of latest technology, stressing an effective operation with low offshore staffing. An operation center with control room will be established in Trondheim. The Ivar Aasen development comprises production of the resources in three discoveries; Ivar Aasen, Hanz and West Cable. The fields are being developed with a manned fixed platform located above the Ivar Aasen discovery and a subsea installation on Hanz tied to the Ivar Aasen platform by means of a flowline and umbilical system. Start of production is tentatively scheduled for 4Q 2016.
Longditude | 62.1792874 |
---|---|
Latitude | 6.0581445 |
Market | Conventional Oil & Gas |
Structure | Jacket |
Hammer | MHP 1600 / MHP 1600 |
Pile Diameter | 2.4 m / 96" |
Water Depth | 110 m / 360 ft |