Enserch Garden Banks 388 Field Development

he Flowline Jumper System (FJS) will be used by Enserch Exploration, Inc. to tie in three existing wells to the 24 well production template installed in Garden Banks Block 388. The FJS allows these existing satellite wells to be connected to the production template via standard wellbays, eliminating the need for dedicated receiver structures, or tie-in porches. Wellbays used for satellite well tie-ins are available for use as template wellsfollowing the removal of the jumper.

Documents / LINKS

Videos

project image
Longditude 27.37
Latitude -92.1
Market Deepwater
Structure Subsea
Hammer MHU 500T DWS
Pile Diameter 1.1 m / 42"
Water Depth 640 m / 2100 ft
Back to top